Showing posts with label Kerbal Space Program. Show all posts
Showing posts with label Kerbal Space Program. Show all posts

Sunday, October 19, 2014

A Grand Day Out: Visiting the Mun in Kerbal Space Program.

Awhile ago, I decided to make my standard "Mun" rocket more efficient and more realistic. I was inspired by the original Saturn V rocket. I decided that rather than simply landing on the moon and going home, my lander would undock from an orbiting module, land on the moon, come back, redock, and fly home. This made the mission much more difficult, but much more efficient since I didn't have to bring the "going home" fuel down to the lunar surface with me.


The rocket begins with 5 large fuel tanks to achieve orbit. The fuel tanks use asparagus staging, making the rocket extremely efficient.


The craft achieves a low equatorial orbit around 70 km.


After achieving orbit, the craft uses the very efficient "Poodle" engine to extend its periapsis to the Mun's altitude.


The craft's orbit intersects the Mun's sphere of influence.


Once inside the Mun's sphere of influence, I make a retrograde burn at my periapsis to circularize my orbit. In the above photo, I am about halfway through the burn.


This photo shows the completed burn.


The lander (on the right in this photo) now detaches from the orbiting module. The orbiter first transfers fuel into the lander to help with the descent and ascent from the surface.


I performed a retrograde burn with the lander to begin the descent. Notice that the lander's orbit (blue) puts it on a landing trajectory whereas the orbiter's orbit (white) remains above the surface.


When the lander neared the surface, I performed another retrograde burn. Then, I set her down in the flattest spot I could find. I sent Handas Kerman out to plant a flag, and then it was time to go back home.


Contrary to achieving orbit back on Kerbin, on the moon, I perform a gravity turn almost instantly. Also, instead of just aiming straight east, I am aiming to intersect the orbit of the orbiting module.


Here, you can see the lander's orbit before the circularization burn. I managed to bring the lander and the orbiter very close on the first time around.


Here, the lander's orbit is almost exactly the same as the orbiter, allowing them to dock.


Here, you can see the orbiter (left) about to dock with the lander (right). The lander has its lights on, so you can see the orbiter in this picture. However, everything else is very dark because the Mun is blocking the sun.

After the two redocked, I performed a standard reentry maneuver to bring the craft back to Kerbin. Along the way, I jettisoned the orbiter module and only brought home the lander.




Thursday, September 4, 2014

Kerbal Space Program: Building a Low Orbit Fueling Station

For awhile, I wanted a way to practically apply my docking skills (that is, having one spacecraft attach to another in space). I used a little bit of the Infernal Robotics mod, but not much. I started off by sending up two base modules and docking them.

Two of these were attached at the front (the end with less docking ports)
After attaching the base modules, I sent up two large fuel tanks attached to one ship. I docked the first tank, then separated the second one, and then docked the second one.

Docking the first of the two orange tanks while the second is still attached. 

The completed station, with both fuel tanks docked. 
The station was complete. It had nearly full fuel tanks, solar panels for electricity, and six docking ports for refueling ships and future additions.

Kerbal Space Program: To Eve (Venus)!

For my next interplanetary mission, I decided to send my Laythe craft to Eve, the KSP equivalent of Venus. This mission was a bit different than my previous missions because, unlike the previous two, my target planet is closer to the sun that Kerbin. this means I had to do my Hohmann transfer in reverse.

As I descended toward the planet, however, I realized that I forgot to account for the composition of the air: Eve's thick, purple atmosphere contains no oxygen. This means that the air breathing jet engine that worked on Laythe would not work here. As a result, I had to rely on luck and try to glide myself to the nearest land.


However, I managed to make it to an island just before I hit the ground.


I deployed my parachutes, and I was able to add Eve to my list of visited celestial bodies!


Kerbal Space Program: To Laythe!

     After the success of my mission to Duna (Mars), I decided to build another rocket. This time, however, I would head for the Joolian System. In Kerbal Space Program, Jool is the equivalent to Jupiter. Laythe is the closest of Jool's five moons, but it is unique in that it has liquid oceans and an oxygen rich atmosphere. This means that air-breathing jet engines will work in its atmosphere. Knowing this, I decided to redesign my rover to be more of a small airplane:


This design had an air intake on its front end and a jet engine on its back, so I couldn't simply stick it on top of a rocket. Instead, I had to sandwich it between two rockets. You can see the rover at the top of this rocket between the two thin, tall fuel tanks:


Notice also the fuel tanks mounted radially around the bottom. Fuel flows from the top tanks and down the chain until it flows into the engine. When a tank runs out, it is ejected with small "separtron" solid boosters. I call this "skeleton staging" due to the fuel tanks' resemblance to a rib cage. I came up with this idea because I wanted a way to eject fuel tanks without ejecting the engines attached to them. It began as a bit of an exercise in absurdity, but it ended up working quite nicely.

I once again used nuclear engines to get a transfer after I had achieved Kerbin orbit. After a lot of time warp, I finally encountered Laythe. Here, you can see Jool (right), Laythe (left), and my craft (middle). You may need to adjust your brightness to see my ship, as I was taking a picture of it from the dark side.


Here's a shot of Laythe in the sun:


Upon entering the atmosphere, I managed to glide the craft for awhile before I throttled up the jet engine. After starting the burn, I did a steady cruise to the nearest island.



Also worth mentioning: Laythe is tidally locked to Jool. This means that the same side of Laythe always faces Jool, just like the same side of the Moon always faces Earth. I managed to get this shot of Jool in the sky as I was flying:


After cruising to an island, I landed the rover with a parachute. Unfortunately, I popped both my back tires upon landing. I could still move around though, and I could even take off again without too much trouble.


That was the end of my mission to Laythe. Next, I sent the same craft to Eve, the KSP equivalent of Venus.

Kerbal Space Program: To Duna (Mars)!

     When going back through some of my old projects, it occurred to me that I should share my Kerbal Space Program missions. KSP is a video game / flight simulator where the player creates rockets and flies them to various locations around the solar system. My first interplanetary mission was a rocket to Duna, the KSP equivalent of Mars. I managed to build a powerful rocket to get a rover into low orbit, and then I used the highly efficient Nuclear Engine to intercept the planet.

Here you can see my orbit (orange) as I leave Kerbin to intercept Duna. This is a form of Hohmann transfer. I chose this over a bi-elliptic transfer because it's faster and easier.


After a few months of in-game time, I'm able to see Duna and its moon, Ike, in the distance.


As I got closer, I started to get a sense of the scale of things:


I managed to catch this beautiful view just before my descent into the atmosphere:


I used a parachute to slow the descent of the rover. However, since the atmosphere is considerably thinner on Duna, the parachute alone wasn't enough to land the craft. To slow the rover in its final stages of descent, I used a skycrane similar to the one used by the curiosity rover. Here is the landed craft with the skycrane still attached:


Here is the rover with the skycrane jettisoned:


That was the end of my Duna/Mars mission. The rover functioned well and I managed to explore quite a bit of the Martian landscape. This mission set the stage for me for future interplanetary missions, like my mission to Laythe.