For awhile, I wanted a way to practically apply my docking skills (that is, having one spacecraft attach to another in space). I used a little bit of the Infernal Robotics mod, but not much. I started off by sending up two base modules and docking them.
 |
| Two of these were attached at the front (the end with less docking ports) |
After attaching the base modules, I sent up two large fuel tanks attached to one ship. I docked the first tank, then separated the second one, and then docked the second one.
 |
| Docking the first of the two orange tanks while the second is still attached. |
 |
| The completed station, with both fuel tanks docked. |
The station was complete. It had nearly full fuel tanks, solar panels for electricity, and six docking ports for refueling ships and future additions.
No comments:
Post a Comment