Showing posts with label Math. Show all posts
Showing posts with label Math. Show all posts

Monday, January 12, 2015

A Homemade Horn

For awhile now, I've been fascinated by wind instruments, particularly the French horn. As mentioned in my previous post, I've always liked harmonics, and wind instruments rely on harmonics to operate, so naturally I wanted to learn to play. However, I had a problem: horns are expensive. So, I decided to make my own for about $10 at the hardware store.

I purchased 12' of .5" diameter tubing, a small copper pipe converter, and a set of funnels. These became the main tubing, mouthpiece, and bell of the horn, respectively. By simply sliding them into one another, I created a simple horn.


The interesting thing about this horn is that it's a natural horn: it can only play the overtone series, but no other notes. If the horn had valves to change the length of tubing, it could play notes outside of this series.
I have never played horn before, but I went ahead and made a video of me trying. Hopefully, I'll get better soon!


Wednesday, November 19, 2014

Playing an Octave in Just Harmonics

I've always loved the way that string harmonics sound. However, I've been unable to really do anything entirely with harmonics because you can't play a full octave using only harmonics. I decided to figure out how many strings I would need to play an octave and I came to the conclusion that three was the smallest number, and the three should be tuned in a first-fourth-fifth fashion. In my example, on the guitar, I tuned my top strings to E-A-B. This lets you play an E major scale, but 2 octaves up from the low string.


I decided to go ahead and try to play a song on these harmonics, so I settled on Minuet in G by Bach (although it is no longer in G because I had to transpose it to E).


I'm considering trying to figure out a tuning where I can do 2 octaves, and I think I may only need 5 strings, but I'm not sure.
It's also worth mentioning that this octave is in just tuning, a tuning system that makes the frequencies of notes in the octave whole number ratios times the tonic frequency.

Sunday, October 19, 2014

A Thing I Made Up: Kelly Diagrams

In my Vector Calculus class recently, we were tasked with writing a paper detailing all rhombic tilings of the sphere with at most two distinct "types" of vertices. A "rhombic tiling of the sphere" effectively means a polyhedron made out of rhombi. I found it difficult to visualize these polyhedra because they exist in three dimensions. Drawing them didn't help much since drawing is a 2D medium. However, I came up with a new way of diagramming polyhedra: the Kelly diagram.

The Kelly diagram for a cube.
To create a Kelly diagram for any polyhedron, draw all of its faces out flat. Then, draw loops around the corners of faces that meet at a vertex. This means that, in a Kelly diagram, each vertex is represented by a loop that encloses the corners of the polygons that meet at the vertex. For example, the Kelly diagram above represents a cube. Note that there are 12 loops, and each one encloses the corners of three squares (for the outermost loop, assume that the area around the drawing is the inside). This is because there are 12 vertices on a cube, and each one has 3 squares meeting at it.

Kelly diagrams were a very useful visualization tool in my paper. Using this new form of diagram, I was able to prove the non-existence of the rhombic octadecahedron. If you want to read my full paper, you can download it here. The file is an open document text (.odt) so you may have to download Openoffice to view it.